Tear-downs and remodels on shaded streets
The mid-century houses along Idylwood Road and Virginia Lane keep giving way to additions and full new builds, and on a leafy, close-packed lot the builder wants a restroom that stays tucked away by the front walk. We park a flushing unit and handwashing station on the drive or a firm edge and pump it from rough framing to final trim.
Where a lot sits tight against the W&OD Trail we bring one well-placed stand and reposition it as the scaffold and roll-off swap out, keeping the vacuum truck off the quiet streets and the trail crossings that thread the neighborhood.
Trail events and Tysons-edge jobs
The runs and rides along the W&OD and the gatherings near West Falls Church draw crowds the fixed restrooms cannot absorb, so we station units at the access points with handwashing stands close by and pump the busiest ones while riders are still out.
The Tysons-edge stretch of Route 7 keeps commercial fit-outs and utility crews busy, and we plant flushing units and handwashing stations on firm ground outside the travel lanes and roll them along as the work moves west.
Pimmit Run terrain and the seasons
The dips draining toward Pimmit Run stay soft after rain, so we perch units on the firm upper part of a lot and anchor them ahead of the summer storm line, then check each on the next run.
Through a wet stretch we favor the driveway or a compacted edge so nothing ruts, and across a long remodel we add warm-weather pump-outs to keep each unit fresh under the heavy tree cover that shades these older Idylwood streets through the season.
